Difference between revisions of "Failure Event - UK, Liverpool - 15 Sep 2020"
Jump to navigation
Jump to search
Line 50: | Line 50: | ||
:''Note: Missing values in this table reflect unknowns.'' | :''Note: Missing values in this table reflect unknowns.'' | ||
If you have any details or corrections you would like to contribute to the database please reach out to [mailto: | If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email]. | ||
<!--Set Semantic information for this system--> | <!--Set Semantic information for this system--> |
Revision as of 10:08, 5 July 2022
Overview
Event Details | |
---|---|
Location: | UK, Liverpool |
Capacity (MW): | 20 |
Capacity (MWh): | 10 |
Battery Module: | |
Integrator: | Orsted |
Application: | Frequency Regulation |
Installation: | |
Enclosure Type: | Container |
Event Date: | 15 September 2020 |
System Age (yr): | 1.5 |
Extent of Damage: | Explosion |
State During Accident: | |
Description: | An explosion occurred before emergency responders were notified. The fire department arrived and contained the fire, which was limited to one out of the three containers, and confirmed end of incident two days later. |
Source: | Investigation Report |
Additional Resources: | Energy Storage News |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.