Failure Event - UK, Liverpool - 15 Sep 2020

From EPRI Storage Wiki
Revision as of 12:40, 14 April 2022 by Jthompson (talk | contribs)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: UK, Liverpool
Capacity (MW): 20
Capacity (MWh): 10
Battery Module: LG Chem [NMC]
Integrator: NEC
Application: Frequency Regulation
Installation: Substation
Enclosure Type: Container
Event Date: 15 September 2020
System Age (yr): 1.5
Extent of Damage: Explosion
State During Accident:
Description:
Source: Energy Storage News
Additional Resources:
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.