|Has Capacity (MWh)=40.0 | |Has Capacity (MWh)=40.0 | ||
|Has Capacity (MW)=5.0 | |Has Capacity (MW)=5.0 | ||
|Has battery vendor= | |Has battery vendor=LG Chem | ||
|Has Integrator=Haugland Energy Group | |Has Integrator=Haugland Energy Group | ||
|Has Application=Resiliency, Utility Peak Reduction | |Has Application=Resiliency, Utility Peak Reduction | ||
Line 68: | Line 68: | ||
|Has Event Description=A 'smoldering battery' was reported, closing down roads and stopping train service for about an hour until the fire was contained. NextEra reported that an internal sprinkler system contained the fire. | |Has Event Description=A 'smoldering battery' was reported, closing down roads and stopping train service for about an hour until the fire was contained. NextEra reported that an internal sprinkler system contained the fire. | ||
|Has Source=[https://www.easthamptonstar.com/police-courts/2023531/roads-closed-trains-halted-over-smoldering-battery East Hampton Star] | |Has Source=[https://www.easthamptonstar.com/police-courts/2023531/roads-closed-trains-halted-over-smoldering-battery East Hampton Star] | ||
|Has Additional Resources=[https://www.27east.com/east-hampton-press/fire-shuts-down-east-hampton-energy-storage-batteries-2165549/ 27east]<br>[https://hauglandgroup.us/blog/press-release-east-hampton-energized/ Haugland Group]<br>[https://der.nyserda.ny.gov/facilities/752/ NYSERDA]<br>[https://www.power-technology.com/marketdata/east-hampton-energy-storage-center-battery-energy-storage-system-us/ Power Technology] | |Has Additional Resources=[https://www.27east.com/east-hampton-press/fire-shuts-down-east-hampton-energy-storage-batteries-2165549/%2027east%5d%3cbr%3e%5bhttps:/hauglandgroup.us/blog/press-release-east-hampton-energized/%20Haugland%20Group%5d%3cbr%3e%5bhttps:/der.nyserda.ny.gov/facilities/752/%20NYSERDA%5d%3cbr%3e%5bhttps:/www.power-technology.com/marketdata/east-hampton-energy-storage-center-battery-energy-storage-system-us/%20Power%20Technology%5d%3cbr%3e%5bhttps:/epri.box.com/shared/static/q5pjeq0787r2e9i9kmtcyts4onurrveg.pdf%20BESS%20Permit [https://www.27east.com/east-hampton-press/fire-shuts-down-east-hampton-energy-storage-batteries-2165549/ 27east]<br>[https://hauglandgroup.us/blog/press-release-east-hampton-energized/ Haugland Group]<br>[https://der.nyserda.ny.gov/facilities/752/ NYSERDA]<br>[https://www.power-technology.com/marketdata/east-hampton-energy-storage-center-battery-energy-storage-system-us/ Power Technology]<br>[https://epri.box.com/shared/static/q5pjeq0787r2e9i9kmtcyts4onurrveg.pdf BESS Permit]] | ||
|Has Failure Event Category=ESS | |Has Failure Event Category=ESS | ||
}} | }} | ||
[[Category:Failure Event]] | [[Category:Failure Event]] |
Revision as of 12:39, 10 April 2024
Overview
Event Details | |
---|---|
Location: | US, NY, East Hampton |
Capacity (MW): | 5 |
Capacity (MWh): | 40 |
Battery Module: | LG Chem |
Integrator: | Haugland Energy Group |
Application: | Resiliency, Utility Peak Reduction |
Installation: | Substation |
Enclosure Type: | Building |
Event Date: | 31 May 2023 |
System Age (yr): | 4.8 |
Extent of Damage: | |
State During Accident: | Operational |
Description: | A 'smoldering battery' was reported, closing down roads and stopping train service for about an hour until the fire was contained. NextEra reported that an internal sprinkler system contained the fire. |
Source: | East Hampton Star |
Additional Resources: | [https://www.27east.com/east-hampton-press/fire-shuts-down-east-hampton-energy-storage-batteries-2165549/ 27east Haugland Group NYSERDA Power Technology BESS Permit] |