Failure Event - US, NY, East Hampton - 31 May 2023
Revision as of 12:15, 21 June 2023 by Jthompson (talk | contribs) (Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em; padding: 0.2em; float: center; clear: left; text-align:left;" ! style="text-align: center; background-color:#ccccff;" colspan="2" |<span style="font-size: larger;">Event Details14px|link=Special:Browse/{{FULLPAGENAME}} |- ! Location: | {{#show: {{FULLPAGENAME}} |?Has Loc...")
Overview
Event Details | |
---|---|
Location: | US, NY, East Hampton |
Capacity (MW): | 5 |
Capacity (MWh): | 40 |
Battery Module: | LG Chem |
Integrator: | Haugland Energy Group |
Application: | Resiliency, Utility Peak Reduction |
Installation: | Substation |
Enclosure Type: | Building |
Event Date: | 31 May 2023 |
System Age (yr): | 4.8 |
Extent of Damage: | |
State During Accident: | Operational |
Description: | A 'smoldering battery' was reported, closing down roads and stopping train service for about an hour until the fire was contained. NextEra reported that an internal sprinkler system contained the fire. |
Source: | East Hampton Star |
Additional Resources: | [https://www.27east.com/east-hampton-press/fire-shuts-down-east-hampton-energy-storage-batteries-2165549/ 27east Haugland Group NYSERDA Power Technology BESS Permit] |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.