Failure Event - USA, Wyoming, Yellowstone National Park - 6 Sep 2022

From EPRI Storage Wiki
Revision as of 15:08, 27 February 2024 by Jthompson (talk | contribs) (Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em; padding: 0.2em; float: center; clear: left; text-align:left;" ! style="text-align: center; background-color:#ccccff;" colspan="2" |<span style="font-size: larger;">Event Details14px|link=Special:Browse/{{FULLPAGENAME}} |- ! Location: | {{#show: {{FULLPAGENAME}} |?Has Loc...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: USA, Wyoming, Yellowstone National Park
Capacity (MW):
Capacity (MWh):
Battery Module:
Integrator:
Application: Solar Integration
Installation: Indoor
Enclosure Type:
Event Date: 6 September 2022
System Age (yr):
Extent of Damage: Exterior of building was undamaged.
State During Accident:
Description: Smoke was seen coming from a building housing a solar plus storage system. West Thumb Geyser Basin was closed for 6 days following the incident.
Source: National Park Service
Additional Resources:
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.