Failure Event - Australia, Victoria, Geelong - 30 Jul 2021
Jump to navigation
Jump to search
Overview
Event Details![]() | |
---|---|
Location: | Australia, Victoria, Geelong |
Capacity (MW): | 300 |
Capacity (MWh): | 450 |
Battery Module: | Tesla |
Integrator: | Tesla |
Application: | Grid Stability |
Installation: | Rural |
Enclosure Type: | Integrated products |
Event Date: | 30 July 2021 |
System Age (yr): | 0 |
Extent of Damage: | Fires in two Megapacks |
State During Accident: | Construction, Commissioning |
Description: | |
Source: | ABC News |
Additional Resources: | Energy Safe Victoria - Statement of Technical Findings Electrek Renew Economy Country Fire Authority EPA Victoria |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.