Failure Event - South Korea, Anjwa-myeon (Anjwa Township), Shinan-gun, Jeollanam-do - 4 Jan 2025
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | South Korea, Anjwa-myeon (Anjwa Township), Shinan-gun, Jeollanam-do |
| Capacity (MW): | 96 |
| Capacity (MWh): | 340 |
| Battery Module: | LG Chem |
| Integrator: | KCH group and Korea Western Power and Top Solar Group |
| Application: | Solar+storage |
| Installation: | |
| Enclosure Type: | |
| Event Date: | 4 January 2025 |
| System Age (yr): | 3.9 |
| Extent of Damage: | |
| State During Accident: | |
| Description: | |
| Root Cause: | |
| Failed Element: | |
| Source: | FPN |
| Additional Resources: | Solar Today Mag E2 News |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.