Failure Event - US, AZ, Peoria - 1 Oct 2025
Revision as of 20:21, 14 January 2026 by Egiarta (talk | contribs) (Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em; padding: 0.2em; float: center; clear: left; text-align:left;" ! style="text-align: center; background-color:#ccccff;" colspan="2" |<span style="font-size: larger;">Event Details14px|link=Special:Browse/{{FULLPAGENAME}} |- ! Location: | {{#show: {{FULLPAGENAME}} |?Has Loc...")
Overview
| Event Details | |
|---|---|
| Location: | US, AZ, Peoria |
| Capacity (MW): | 25 |
| Capacity (MWh): | 100 |
| Battery Module: | NMC |
| Integrator: | Tesla |
| Application: | Peak shaving |
| Installation: | Substation |
| Enclosure Type: | Container |
| Event Date: | 1 October 2025 |
| System Age (yr): | 4 |
| Extent of Damage: | |
| State During Accident: | Operational |
| Description: | A fire occurred in a Megapack at the Bolster Substation Battery. Firefighters cooled adjacent Megapacks with water, and the fire was allowed to burn out under controlled conditions. No outages were associated with the incident. |
| Root Cause: | |
| Failed Element: | |
| Source: | AZ Family |
| Additional Resources: | T&D World |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.