Failure Event - US, CA, Moss Landing - 13 Feb 2022

From EPRI Storage Wiki
Revision as of 00:54, 7 October 2024 by Jthompson (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 100
Capacity (MWh): 400
Battery Module: LG Energy Solution
Integrator:
Application: Solar Integration
Installation: Power Plant
Enclosure Type: Building
Event Date: 13 February 2022
System Age (yr): 1
Extent of Damage: Burnt racks
State During Accident: Operational
Description:
Root Cause: Integration, Construction, or Assembly
Failed Element: Balance of plant
Source: KSBW News
Additional Resources: Vistra Corp
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.