Difference between revisions of "Failure Event - Australia, Victoria, Geelong - 30 Jul 2021"

From EPRI Storage Wiki
Jump to navigation Jump to search
Line 61: Line 61:
  |Has Event Date=07/30/2021
  |Has Event Date=07/30/2021
  |Has System Age (yr)=0.0
  |Has System Age (yr)=0.0
  |Has Extent of Damage=Single Megapack fully burnt
  |Has Extent of Damage=Fires in two Megapacks
  |Has State During Accident=Construction, Commissioning
  |Has State During Accident=Construction, Commissioning
  |Has Source=[https://www.abc.net.au/news/2021-07-30/tesla-battery-fire-moorabool-geelong/100337488 ABC News]
  |Has Source=[https://www.abc.net.au/news/2021-07-30/tesla-battery-fire-moorabool-geelong/100337488 ABC News]

Revision as of 11:39, 1 October 2021

Overview

Event DetailsSMW-Info-button.png
Location: Australia, Victoria, Geelong
Capacity (MW): 300
Capacity (MWh): 450
Battery Module: Tesla
Integrator: Tesla
Application: Grid Stability
Installation: Rural
Enclosure Type: Integrated products
Event Date: 30 July 2021
System Age (yr): 0
Extent of Damage: Fires in two Megapacks
State During Accident: Construction, Commissioning
Source: ABC News
Additional Resources: Energy Safe Victoria - Statement of Technical Findings
Electrek
Renew Economy
Country Fire Authority
EPA Victoria
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.