Failure Event - Australia, Victoria, Geelong - 30 Jul 2021

From EPRI Storage Wiki
Revision as of 10:08, 5 July 2022 by Jthompson (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: Australia, Victoria, Geelong
Capacity (MW): 300
Capacity (MWh): 450
Battery Module: Tesla
Integrator: Tesla
Application: Grid Stability
Installation: Rural
Enclosure Type: Integrated products
Event Date: 30 July 2021
System Age (yr): 0
Extent of Damage: Fires in two Megapacks
State During Accident: Construction, Commissioning
Description:
Source: ABC News
Additional Resources: Energy Safe Victoria - Statement of Technical Findings
Electrek
Renew Economy
Country Fire Authority
EPA Victoria
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.