Failure Event - South Korea, Haenam - 27 May 2020
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Overview
Event Details | |
---|---|
Location: | South Korea, Haenam |
Capacity (MW): | |
Capacity (MWh): | |
Battery Module: | |
Integrator: | |
Application: | Solar Integration |
Installation: | Field |
Enclosure Type: | Prefab |
Event Date: | 27 May 2020 |
System Age (yr): | 2.2 |
Extent of Damage: | Fire |
State During Accident: | |
Description: | The BESS at a solar + storage facility caught fire. The South Korean government had implemented an upper limit of SOC of 90% for outdoor installations at the beginning of the year, but it was confirmed that the company had continued to operate with an upper limit of SOC of 95% as before. The cause is suspected to be battery deterioration due to overcharging or BMS error. |
Source: | E2 News (Translated) |
Additional Resources: | E2 News (Original source, Korean) |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.