Difference between revisions of "Failure Event - UK, Liverpool - 15 Sep 2020"
Jump to navigation
Jump to search
(Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...") |
|||
Line 64: | Line 64: | ||
|Has State During Accident= | |Has State During Accident= | ||
|Has Source=[https://www.energy-storage.news/news/fire-at-20mw-uk-battery-storage-plant-in-liverpool Energy Storage News] | |Has Source=[https://www.energy-storage.news/news/fire-at-20mw-uk-battery-storage-plant-in-liverpool Energy Storage News] | ||
|Has Additional Resources= | |Has Additional Resources= | ||
|Has Failure Event Category=ESS | |Has Failure Event Category=ESS | ||
}} | }} | ||
[[Category:Failure Event]] | [[Category:Failure Event]] |
Revision as of 11:06, 30 July 2021
Overview
Event Details | |
---|---|
Location: | UK, Liverpool |
Capacity (MW): | 20 |
Capacity (MWh): | 10 |
Battery Module: | LG Chem [NMC] |
Integrator: | NEC |
Application: | Frequency Regulation |
Installation: | Substation |
Enclosure Type: | Container |
Event Date: | 15 September 2020 |
System Age (yr): | 1.5 |
Extent of Damage: | Explosion |
State During Accident: | |
Source: | Energy Storage News |
Additional Resources: |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.