Difference between revisions of "Failure Event - UK, Liverpool - 15 Sep 2020"

From EPRI Storage Wiki
Jump to navigation Jump to search
(Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...")
 
(2 intermediate revisions by the same user not shown)
Line 38: Line 38:
! State During Accident:
! State During Accident:
| {{#show: {{FULLPAGENAME}} |?Has State During Accident}}
| {{#show: {{FULLPAGENAME}} |?Has State During Accident}}
|-
! Description:
| {{#show: {{FULLPAGENAME}} |?Has Event Description}}
|-
|-
! Source:
! Source:
Line 47: Line 50:
:''Note: Missing values in this table reflect unknowns.''
:''Note: Missing values in this table reflect unknowns.''


If you have any details or corrections you would like to contribute to the database please reach out to [mailto:dlong@epri.com Dirk Long].
If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email].


<!--Set Semantic information for this system-->
<!--Set Semantic information for this system-->
Line 63: Line 66:
  |Has Extent of Damage=Explosion
  |Has Extent of Damage=Explosion
  |Has State During Accident=
  |Has State During Accident=
|Has Event Description=
  |Has Source=[https://www.energy-storage.news/news/fire-at-20mw-uk-battery-storage-plant-in-liverpool Energy Storage News]
  |Has Source=[https://www.energy-storage.news/news/fire-at-20mw-uk-battery-storage-plant-in-liverpool Energy Storage News]
  |Has Additional Resources=[https://orsted.com/en/media/newsroom/news/2019/01/orsteds-first-standalone-battery-storage-project-now-complete https://orsted.com/en/media/newsroom/news/2019/01/orsteds-first-standalone-battery-storage-project-now-complete ]
  |Has Additional Resources=
  |Has Failure Event Category=ESS
  |Has Failure Event Category=ESS
}}
}}


[[Category:Failure Event]]
[[Category:Failure Event]]

Revision as of 10:08, 5 July 2022

Overview

Event DetailsSMW-Info-button.png
Location: UK, Liverpool
Capacity (MW): 20
Capacity (MWh): 10
Battery Module:
Integrator: Orsted
Application: Frequency Regulation
Installation:
Enclosure Type: Container
Event Date: 15 September 2020
System Age (yr): 1.5
Extent of Damage: Explosion
State During Accident:
Description: An explosion occurred before emergency responders were notified. The fire department arrived and contained the fire, which was limited to one out of the three containers, and confirmed end of incident two days later.
Source: Investigation Report
Additional Resources: Energy Storage News
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.