Difference between revisions of "Failure Event - UK, Liverpool - 15 Sep 2020"

From EPRI Storage Wiki
Jump to navigation Jump to search
(Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...")
 
Line 64: Line 64:
  |Has State During Accident=
  |Has State During Accident=
  |Has Source=[https://www.energy-storage.news/news/fire-at-20mw-uk-battery-storage-plant-in-liverpool Energy Storage News]
  |Has Source=[https://www.energy-storage.news/news/fire-at-20mw-uk-battery-storage-plant-in-liverpool Energy Storage News]
  |Has Additional Resources=[https://orsted.com/en/media/newsroom/news/2019/01/orsteds-first-standalone-battery-storage-project-now-complete https://orsted.com/en/media/newsroom/news/2019/01/orsteds-first-standalone-battery-storage-project-now-complete ]
  |Has Additional Resources=
  |Has Failure Event Category=ESS
  |Has Failure Event Category=ESS
}}
}}


[[Category:Failure Event]]
[[Category:Failure Event]]

Revision as of 11:06, 30 July 2021

Overview

Event DetailsSMW-Info-button.png
Location: UK, Liverpool
Capacity (MW): 20
Capacity (MWh): 10
Battery Module: LG Chem [NMC]
Integrator: NEC
Application: Frequency Regulation
Installation: Substation
Enclosure Type: Container
Event Date: 15 September 2020
System Age (yr): 1.5
Extent of Damage: Explosion
State During Accident:
Source: Energy Storage News
Additional Resources:
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.