Failure Event - UK, Liverpool - 15 Sep 2020

From EPRI Storage Wiki
Revision as of 12:36, 8 July 2021 by Jthompson (talk | contribs) (Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: UK, Liverpool
Capacity (MW): 20
Capacity (MWh): 10
Battery Module:
Integrator: Orsted
Application: Frequency Regulation
Installation:
Enclosure Type: Container
Event Date: 15 September 2020
System Age (yr): 1.5
Extent of Damage: Explosion
State During Accident:
Source: Investigation Report
Additional Resources: Energy Storage News
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.