Difference between revisions of "Failure Event - US, AZ, Chandler - 18 Apr 2022"

From EPRI Storage Wiki
Jump to navigation Jump to search
 
Line 50: Line 50:
:''Note: Missing values in this table reflect unknowns.''
:''Note: Missing values in this table reflect unknowns.''


If you have any details or corrections you would like to contribute to the database please reach out to [mailto:dlong@epri.com Dirk Long].
If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email].


<!--Set Semantic information for this system-->
<!--Set Semantic information for this system-->

Latest revision as of 10:08, 5 July 2022

Overview

Event DetailsSMW-Info-button.png
Location: US, AZ, Chandler
Capacity (MW): 10
Capacity (MWh): 40
Battery Module: LG Chem [NMC]
Integrator: AES/Fluence
Application:
Installation: Substation
Enclosure Type: Building
Event Date: 18 April 2022
System Age (yr): 3
Extent of Damage:
State During Accident: Operational
Description:
Source: AZ Central
Additional Resources: Fluence Energy
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.