  Has Location=[[Failure Event - US, CA, Moss Landing - 13 Feb 2022|US, CA, Moss Landing]]
  Has Location=[[Failure Event - US, CA, Moss Landing - 13 Feb 2022|US, CA, Moss Landing]]
  |Has Capacity (MWh)=1200.0
  |Has Capacity (MWh)=400.0
  |Has Capacity (MW)=300.0
  |Has Capacity (MW)=100.0
  |Has battery vendor=LG Energy Solution
  |Has battery vendor=LG Energy Solution
  |Has Integrator=Fluence
  |Has Integrator=Fluence

Revision as of 15:35, 15 February 2022

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 100
Capacity (MWh): 400
Battery Module: LG Energy Solution
Integrator:
Application: Solar Integration
Installation: Power Plant
Enclosure Type: Building
Event Date: 13 February 2022
System Age (yr): 1
Extent of Damage: Burnt racks
State During Accident: Operational
Source: KSBW News
Additional Resources: Vistra Corp
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.