Difference between revisions of "Failure Event - US, CA, Moss Landing - 13 Feb 2022"
Jump to navigation
Jump to search
Line 55: | Line 55: | ||
|Has Capacity (MW)=100.0 | |Has Capacity (MW)=100.0 | ||
|Has battery vendor=LG Energy Solution | |Has battery vendor=LG Energy Solution | ||
|Has Integrator= | |Has Integrator= | ||
|Has Application=Solar Integration | |Has Application=Solar Integration | ||
|Has Installation=Power Plant | |Has Installation=Power Plant |
Revision as of 11:05, 18 February 2022
Overview
Event Details | |
---|---|
Location: | US, CA, Moss Landing |
Capacity (MW): | 100 |
Capacity (MWh): | 400 |
Battery Module: | LG Energy Solution |
Integrator: | |
Application: | Solar Integration |
Installation: | Power Plant |
Enclosure Type: | Building |
Event Date: | 13 February 2022 |
System Age (yr): | 1 |
Extent of Damage: | Burnt racks |
State During Accident: | Operational |
Source: | KSBW News |
Additional Resources: | Vistra Corp |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.