Difference between revisions of "Failure Event - US, CA, Moss Landing - 13 Feb 2022"

From EPRI Storage Wiki
Jump to navigation Jump to search
(2 intermediate revisions by the same user not shown)
Line 38: Line 38:
! State During Accident:
! State During Accident:
| {{#show: {{FULLPAGENAME}} |?Has State During Accident}}
| {{#show: {{FULLPAGENAME}} |?Has State During Accident}}
|-
! Description:
| {{#show: {{FULLPAGENAME}} |?Has Event Description}}
|-
|-
! Source:
! Source:
Line 47: Line 50:
:''Note: Missing values in this table reflect unknowns.''
:''Note: Missing values in this table reflect unknowns.''


If you have any details or corrections you would like to contribute to the database please reach out to [mailto:dlong@epri.com Dirk Long].
If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email].


<!--Set Semantic information for this system-->
<!--Set Semantic information for this system-->
Line 55: Line 58:
  |Has Capacity (MW)=100.0
  |Has Capacity (MW)=100.0
  |Has battery vendor=LG Energy Solution
  |Has battery vendor=LG Energy Solution
  |Has Integrator=Fluence
  |Has Integrator=
  |Has Application=Solar Integration
  |Has Application=Solar Integration
  |Has Installation=Power Plant
  |Has Installation=Power Plant
Line 63: Line 66:
  |Has Extent of Damage=Burnt racks
  |Has Extent of Damage=Burnt racks
  |Has State During Accident=Operational
  |Has State During Accident=Operational
|Has Event Description=
  |Has Source=[https://www.ksbw.com/article/second-battery-malfunction-in-less-than-6-months-reported-at-moss-landing-power-plant/39083568 KSBW News]
  |Has Source=[https://www.ksbw.com/article/second-battery-malfunction-in-less-than-6-months-reported-at-moss-landing-power-plant/39083568 KSBW News]
  |Has Additional Resources=[https://investor.vistracorp.com/news?item=220 Vistra Corp]
  |Has Additional Resources=[https://investor.vistracorp.com/news?item=220 Vistra Corp]

Revision as of 10:08, 5 July 2022

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 100
Capacity (MWh): 400
Battery Module: LG Energy Solution
Integrator:
Application: Solar Integration
Installation: Power Plant
Enclosure Type: Building
Event Date: 13 February 2022
System Age (yr): 1
Extent of Damage: Burnt racks
State During Accident: Operational
Description:
Source: KSBW News
Additional Resources: Vistra Corp
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.