Difference between revisions of "Failure Event - US, CA, Moss Landing - 13 Feb 2022"
Jump to navigation
Jump to search
Line 50: | Line 50: | ||
:''Note: Missing values in this table reflect unknowns.'' | :''Note: Missing values in this table reflect unknowns.'' | ||
If you have any details or corrections you would like to contribute to the database please reach out to [mailto: | If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email]. | ||
<!--Set Semantic information for this system--> | <!--Set Semantic information for this system--> |
Revision as of 10:08, 5 July 2022
Overview
Event Details | |
---|---|
Location: | US, CA, Moss Landing |
Capacity (MW): | 100 |
Capacity (MWh): | 400 |
Battery Module: | LG Energy Solution |
Integrator: | |
Application: | Solar Integration |
Installation: | Power Plant |
Enclosure Type: | Building |
Event Date: | 13 February 2022 |
System Age (yr): | 1 |
Extent of Damage: | Burnt racks |
State During Accident: | Operational |
Description: | |
Source: | KSBW News |
Additional Resources: | Vistra Corp |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.