Failure Event - US, CA, Moss Landing - 13 Feb 2022

From EPRI Storage Wiki
Revision as of 14:10, 15 February 2022 by Jthompson (talk | contribs) (Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 100
Capacity (MWh): 400
Battery Module: LG Energy Solution
Integrator:
Application: Solar Integration
Installation: Power Plant
Enclosure Type: Building
Event Date: 13 February 2022
System Age (yr): 1
Extent of Damage: Burnt racks
State During Accident: Operational
Source: KSBW News
Additional Resources: Vistra Corp
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.