Difference between revisions of "Failure Event - US, CA, Moss Landing - 4 Sep 2021"

From EPRI Storage Wiki
Jump to navigation Jump to search
Line 38: Line 38:
! State During Accident:
! State During Accident:
| {{#show: {{FULLPAGENAME}} |?Has State During Accident}}
| {{#show: {{FULLPAGENAME}} |?Has State During Accident}}
|-
! Description:
| {{#show: {{FULLPAGENAME}} |?Has Event Description}}
|-
|-
! Source:
! Source:
Line 63: Line 66:
  |Has Extent of Damage=Scorched racks, melted wires
  |Has Extent of Damage=Scorched racks, melted wires
  |Has State During Accident=
  |Has State During Accident=
|Has Event Description=
  |Has Source=[https://investor.vistracorp.com/news?item=197 Vistra]
  |Has Source=[https://investor.vistracorp.com/news?item=197 Vistra]
  |Has Additional Resources=[https://pv-magazine-usa.com/2021/09/07/moss-landing-energy-storage-facility-knocked-offline-after-batteries-overheat/ PV Magazine]<br>[https://vistra.app.box.com/s/1aezfypko93vz5jm9nn9tckphtjkgzvb Vistra Findings and Corrective Actions Report]
  |Has Additional Resources=[https://pv-magazine-usa.com/2021/09/07/moss-landing-energy-storage-facility-knocked-offline-after-batteries-overheat/ PV Magazine]<br>[https://vistra.app.box.com/s/1aezfypko93vz5jm9nn9tckphtjkgzvb Vistra Findings and Corrective Actions Report]

Revision as of 12:40, 14 April 2022

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 300
Capacity (MWh): 1,200
Battery Module: LG Energy Solution
Integrator: Fluence
Application: Solar Integration
Installation: Power Plant
Enclosure Type:
Event Date: 4 September 2021
System Age (yr): 0.8
Extent of Damage: Scorched racks, melted wires
State During Accident:
Description:
Source: Vistra
Additional Resources: PV Magazine
Vistra Findings and Corrective Actions Report
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.