Difference between revisions of "Failure Event - US, CA, Moss Landing - 4 Sep 2021"

From EPRI Storage Wiki
Jump to navigation Jump to search
(Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...")
 
Line 56: Line 56:
  |Has battery vendor=LG Energy Solution
  |Has battery vendor=LG Energy Solution
  |Has Integrator=Fluence
  |Has Integrator=Fluence
  |Has Application=Grid Stability
  |Has Application=Solar Integration
  |Has Installation=Power Plant
  |Has Installation=Power Plant
  |Has Enclosure Type=Container
  |Has Enclosure Type=
  |Has Event Date=09/04/2021
  |Has Event Date=09/04/2021
  |Has System Age (yr)=0.8
  |Has System Age (yr)=0.8

Revision as of 08:55, 27 September 2021

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 300
Capacity (MWh): 1,200
Battery Module: LG Energy Solution
Integrator: Fluence
Application: Solar Integration
Installation: Power Plant
Enclosure Type:
Event Date: 4 September 2021
System Age (yr): 0.8
Extent of Damage: Scorched racks, melted wires
State During Accident:
Source: Vistra
Additional Resources: PV Magazine
Vistra Findings and Corrective Actions Report
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.