Difference between revisions of "Failure Event - US, CA, Moss Landing - 4 Sep 2021"

From EPRI Storage Wiki
Jump to navigation Jump to search
Line 68: Line 68:
  |Has Event Description=
  |Has Event Description=
  |Has Source=[https://investor.vistracorp.com/news?item=197 Vistra]
  |Has Source=[https://investor.vistracorp.com/news?item=197 Vistra]
  |Has Additional Resources=[https://pv-magazine-usa.com/2021/09/07/moss-landing-energy-storage-facility-knocked-offline-after-batteries-overheat/ PV Magazine]<br>[https://vistra.app.box.com/s/1aezfypko93vz5jm9nn9tckphtjkgzvb Vistra Findings and Corrective Actions Report]
  |Has Additional Resources=[https://pv-magazine-usa.com/2021/09/07/moss-landing-energy-storage-facility-knocked-offline-after-batteries-overheat/%20PV%20Magazine%5d%3cbr%3e%5bhttps:/vistra.app.box.com/s/1aezfypko93vz5jm9nn9tckphtjkgzvb%20Vistra%20Findings%20and%20Corrective%20Actions%20Report [https://pv-magazine-usa.com/2021/09/07/moss-landing-energy-storage-facility-knocked-offline-after-batteries-overheat/ PV Magazine]<br>[https://vistra.app.box.com/s/1aezfypko93vz5jm9nn9tckphtjkgzvb Vistra Findings and Corrective Actions Report]]
  |Has Failure Event Category=ESS
  |Has Failure Event Category=ESS
}}
}}


[[Category:Failure Event]]
[[Category:Failure Event]]

Revision as of 15:10, 20 September 2022

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 300
Capacity (MWh): 1,200
Battery Module: LG Energy Solution
Integrator: Fluence
Application: Solar Integration
Installation: Power Plant
Enclosure Type:
Event Date: 4 September 2021
System Age (yr): 0.8
Extent of Damage: Scorched racks, melted wires
State During Accident:
Description:
Source: Vistra
Additional Resources: PV Magazine
Vistra Findings and Corrective Actions Report
Note: Missing values in this table reflect unknowns.