Failure Event - US, CA, Moss Landing - 4 Sep 2021

From EPRI Storage Wiki
Revision as of 17:17, 7 September 2021 by Jthompson (talk | contribs) (Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 300
Capacity (MWh): 1,200
Battery Module: LG Energy Solution
Integrator: Fluence
Application: Solar Integration
Installation: Power Plant
Enclosure Type:
Event Date: 4 September 2021
System Age (yr): 0.8
Extent of Damage: Scorched racks, melted wires
State During Accident:
Source: Vistra
Additional Resources: [https://pv-magazine-usa.com/2021/09/07/moss-landing-energy-storage-facility-knocked-offline-after-batteries-overheat PV Magazine
Vistra Findings and Corrective Actions Report]
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.