Failure Event - US, HI, Kahuku - 1 Aug 2012

From EPRI Storage Wiki
Revision as of 12:41, 14 April 2022 by Jthompson (talk | contribs)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: US, HI, Kahuku
Capacity (MW): 15
Capacity (MWh): 10
Battery Module: Xtreme [PbA]
Integrator:
Application: Wind Integration
Installation: Island
Enclosure Type: Prefab
Event Date: 1 August 2012
System Age (yr): 1.5
Extent of Damage: Fire
State During Accident:
Description: The BESS, co-located with a 30 MW wind farm, caught fire.
Source: Hawaii News Now
Additional Resources:
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.