Difference between revisions of "Failure Event - US, IL, LaSalle - 19 Jul 2021"

From EPRI Storage Wiki
Jump to navigation Jump to search
Line 50: Line 50:
:''Note: Missing values in this table reflect unknowns.''
:''Note: Missing values in this table reflect unknowns.''


If you have any details or corrections you would like to contribute to the database please reach out to [mailto:dlong@epri.com Dirk Long].
If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email].


<!--Set Semantic information for this system-->
<!--Set Semantic information for this system-->

Revision as of 10:08, 5 July 2022

Overview

Event DetailsSMW-Info-button.png
Location: US, IL, LaSalle
Capacity (MW): 72
Capacity (MWh): 72
Battery Module: LFP
Integrator: Energport
Application: Frequency Regulation
Installation: Rural
Enclosure Type: Container
Event Date: 19 July 2021
System Age (yr): 1.6
Extent of Damage:
State During Accident:
Description:
Source: The Times
Additional Resources: Energy Storage News
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.