Failure Event - US, IL, LaSalle - 19 Jul 2021

From EPRI Storage Wiki
Revision as of 12:40, 14 April 2022 by Jthompson (talk | contribs)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: US, IL, LaSalle
Capacity (MW): 36
Capacity (MWh): 36
Battery Module: Sinexcel [LFP]
Integrator: Energport
Application: Solar and Wind Integration, Frequency Regulation
Installation: Rural
Enclosure Type: Container
Event Date: 19 July 2021
System Age (yr): 1.6
Extent of Damage:
State During Accident:
Description: One container at a BESS plant caught fire. The fire was extinguished later the same day.
Source: WSPY
Additional Resources: Energy Storage News
WCMY
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.