Difference between revisions of "Template:Deployment RACI Nav Table"

From EPRI Storage Wiki
Jump to navigation Jump to search
Line 90: Line 90:
| colspan="10" | [[Utility_BESS_Handbook/Handbook_Deployment_and_Integration#Installation_and_Integration|'''Installation and Integration''']]
| colspan="10" | [[Utility_BESS_Handbook/Handbook_Deployment_and_Integration#Installation_and_Integration|'''Installation and Integration''']]
|-
|-
| style="padding-left: 2em;" |  
| style="padding-left: 2em;" | [[Utility_BESS_Handbook/Handbook_Deployment_and_Integration#Construction_Management|Construction Management]]
[[Utility_BESS_Handbook/Handbook_Deployment_and_Integration#Construction_Management|Construction Management]]
| style="text-align: center;" | A
| style="text-align: center;" | A
| style="text-align: center;" | C
| style="text-align: center;" | C

Revision as of 20:14, 8 November 2023

This is the "Deployment RACI Nav Table" template used to quickly and concisely add this RACI Nav Table to a page.

To use this, place

{{Deployment RACI Nav Table}}

in the desired location on a page.

Template preview

Chapter 4: Deployment & Integration - Outline and RACI Matrix Project Mgmt. Engineering Safety Operations Legal IT / OT / Cyber Enviro. Supply Chain Corporate Mgmt.
Engineering and Permitting
Site Engineering A R C C I C C C -
System Engineering A R C C I C I C -
Interconnection Analysis A R C C C C I C -
Permitting A R I I C I C C I
Factory Acceptance Test A R C C I C I R I
Shipping and Receiving A C C R I I C R I
Installation and Integration
Construction Management A C C R C I C C -
Commissioning A R C C I C I I I
Interconnection A R C C C C I I I
Performance Testing A R C C I C I I I