| Line 75: | Line 75: | ||
|Has Root Cause= | |Has Root Cause= | ||
|Has Failed Element= | |Has Failed Element= | ||
|Has Source=[https:// | |Has Source=[https://epri.box.com/shared/static/senpq3dpc0eta14d5bf8vhpluy9eh28r.pdf Sohu] | ||
|Has Additional Resources= | |Has Additional Resources= | ||
|Has Failure Event Category=ESS | |Has Failure Event Category=ESS | ||
Latest revision as of 01:53, 7 October 2024
Overview
| Event Details | |
|---|---|
| Location: | China, Shanxi |
| Capacity (MW): | |
| Capacity (MWh): | |
| Battery Module: | |
| Integrator: | |
| Application: | |
| Installation: | |
| Enclosure Type: | Container |
| Event Date: | 21 December 2017 |
| System Age (yr): | |
| Extent of Damage: | |
| State During Accident: | |
| Description: | BESS containers caught fire. The same site experienced a failure and fire 8 months prior. |
| Root Cause: | |
| Failed Element: | |
| Source: | Sohu |
| Additional Resources: | |
- Note: Missing values in this table reflect unknowns.