Difference between revisions of "Template:Planning RACI Nav Table"

From EPRI Storage Wiki
Jump to navigation Jump to search
Tags: Reverted Manual revert
Tag: Manual revert
Line 21: Line 21:
! Corporate Mgmt.
! Corporate Mgmt.
|-
|-
| nan
| [[Utility_BESS_Handbook/Handbook_Planning#General_Consideration:_Team_Building,_Participation,_and_Utility_Department_Roles|'''Team Building, Participation, and Utility Dept. Roles''']]
| A
| A
| C
| C
Line 33: Line 33:
| C
| C
|-
|-
| nan
| [[Utility_BESS_Handbook/Handbook_Planning#Defining_the_Problem_and_Assessing_Energy_Storage_as_a_Solution|'''Define the Problem and Assess Energy Storage as Potential Solution''']]
| A
| A
| C/R
| C/R
Line 45: Line 45:
| -
| -
|-
|-
| colspan="11" | nan
| colspan="11" | [[Utility_BESS_Handbook/Handbook_Planning#Specify_Minimum_Energy_Storage_Solution_Requirements|'''Specify Minimum Energy Storage Solution Requirements''']]
|-
|-
| Site Specific Applications and Planning
| [[Utility_BESS_Handbook/Handbook_Planning#Site-specific_Applications_and_Planning|Site Specific Applications and Planning]]
| A
| A
| C/R
| C/R
Line 59: Line 59:
| -
| -
|-
|-
| System-wide Applications and Planning
| [[Utility_BESS_Handbook/Handbook_Planning#System-wide_Applications_and_Planning|System-wide Applications and Planning]]
| A
| A
| C
| C
Line 71: Line 71:
| -
| -
|-
|-
| nan
| [[Utility_BESS_Handbook/Handbook_Planning#Evaluating_Technical_Feasibility|'''Evaluate Technical Feasibility''']]
| A
| A
| C/R
| C/R
Line 83: Line 83:
| -
| -
|-
|-
| colspan="11" | nan
| colspan="11" | [[Utility_BESS_Handbook/Handbook_Planning#Finalizing_Case-Specific_Requirements_of_Battery_Energy_Storage|'''Finalize Case-Specific Requirements of Energy Storage''']]
|-
|-
| Energy Storage Asset Ownership
| [[Utility_BESS_Handbook/Handbook_Planning#Energy_Storage_Asset_Ownership|Energy Storage Asset Ownership]]
| A
| A
| C/R
| C/R
Line 97: Line 97:
| -
| -
|-
|-
| Energy Storage System Performance
| [[Utility_BESS_Handbook/Handbook_Planning#Energy_Storage_System_Performance_Specification|Energy Storage System Performance]]
| A
| A
| C/R
| C/R
Line 109: Line 109:
| -
| -
|-
|-
| Communication, Control, and Cybersecurity Requirements
| [[Utility_BESS_Handbook/Handbook_Planning#Communication,_Control,_and_Cybersecurity_System_Requirements|Communication, Control, and Cybersecurity Requirements]]
| A
| A
| C
| C
Line 121: Line 121:
| -
| -
|-
|-
| Site Requirements and Availability
| [[Utility_BESS_Handbook/Handbook_Planning#Site_Requirements_and_Availability|Site Requirements and Availability]]
| A
| A
| C
| C
Line 133: Line 133:
| -
| -
|-
|-
| Local Constraints
| [[Utility_BESS_Handbook/Handbook_Planning#Local_Constraints|Local Constraints]]
| A
| A
| C
| C
Line 145: Line 145:
| -
| -
|-
|-
| Request for Information (RFI)
| [[Utility_BESS_Handbook/Handbook_Planning#Request_for_Information|Request for Information (RFI)]]
| A
| A
| R
| R
Line 157: Line 157:
| -
| -
|-
|-
| nan
| [[Utility_BESS_Handbook/Handbook_Planning#Financial_Analysis|'''Financial Analysis''']]
| A
| A
| C/R
| C/R
Line 169: Line 169:
| -
| -
|-
|-
| nan
| [[Utility_BESS_Handbook/Handbook_Planning#Business_Case|'''Business Case''']]
| A
| A
| C/R
| C/R
Line 181: Line 181:
| C
| C
|-
|-
| colspan="11" | nan
| colspan="11" | [[Utility_BESS_Handbook/Handbook_Planning#Planning_Resources|'''Additional Planning Resources''']]

Revision as of 13:09, 21 August 2023

This is the "Planning RACI Nav Table" template used to quickly and concisely add this RACI Nav Table to a page.

To use this, place

{{Planning RACI Nav Table}}

in the desired location on a page.

Template preview

Planning Project Mgmt. Engineering Safety Operations Legal IT / Cybersecurity Finance Land Planning Corporate Mgmt.
Team Building, Participation, and Utility Dept. Roles A C C C C C C C C C
Define the Problem and Assess Energy Storage as Potential Solution A C/R I C/R I I I I C/R -
Specify Minimum Energy Storage Solution Requirements
Site Specific Applications and Planning A C/R I C/R I I I I C -
System-wide Applications and Planning A C I C I I I I R -
Evaluate Technical Feasibility A C/R I C/R I C I I C/R -
Finalize Case-Specific Requirements of Energy Storage
Energy Storage Asset Ownership A C/R C C/R C I C/R I C/R -
Energy Storage System Performance A C/R I C/R I C I I C/R -
Communication, Control, and Cybersecurity Requirements A C I C I R I I C -
Site Requirements and Availability A C R C I I I I C -
Local Constraints A C R I I I I C I -
Request for Information (RFI) A R R R C R I C R -
Financial Analysis A C/R I C/R I I C/R I C/R -
Business Case A C/R I C/R I I C/R I C/R C
Additional Planning Resources