Difference between revisions of "Template:Deployment RACI Nav Table"

From EPRI Storage Wiki
Jump to navigation Jump to search
Line 102: Line 102:
| style="text-align: center;" | -
| style="text-align: center;" | -
|-
|-
| colspan="10" | [[Utility_BESS_Handbook/Handbook_Operations_and_Maintenance#Handoff_to_Operations|'''Commissioning''']]
| [[Utility_BESS_Handbook/Handbook_Operations_and_Maintenance#Handoff_to_Operations|'''Commissioning''']]
| style="text-align: center;" | A
| style="text-align: center;" | A
| style="text-align: center;" | R
| style="text-align: center;" | R
Line 113: Line 113:
| style="text-align: center;" | I
| style="text-align: center;" | I
|-
|-
| colspan="10" | [[Utility_BESS_Handbook/Handbook_Operations_and_Maintenance#Handoff_to_Operations|'''Interconnection''']]
| [[Utility_BESS_Handbook/Handbook_Operations_and_Maintenance#Handoff_to_Operations|'''Interconnection''']]
| style="text-align: center;" | A
| style="text-align: center;" | A
| style="text-align: center;" | R
| style="text-align: center;" | R

Revision as of 19:37, 8 November 2023

This is the "Deployment RACI Nav Table" template used to quickly and concisely add this RACI Nav Table to a page.

To use this, place

{{Deployment RACI Nav Table}}

in the desired location on a page.

Template preview

Chapter 4: Deployment & Integration - Outline and RACI Matrix Project Mgmt. Engineering Safety Operations Legal IT / OT / Cyber Enviro. Supply Chain Corporate Mgmt.
Engineering and Permitting
Site Engineering A R C C I C C C -
System Engineering A R C C I C I C -
Interconnection Analysis A R C C C C I C -
Permitting A R I I C I C C I
Factory Acceptance Test A R C C I C I R I
Shipping and Receiving A C C R I I C R I
Installation and Integration

Construction Management

A C C R C I C C -
Commissioning A R C C I C I I I
Interconnection A R C C C C I I I
Performance Testing A R C C I C I I I