US, CA, Escondido
|
Failure Incident Details
|
Location
|
US, CA, Escondido
|
Date
|
5 September 2024
|
Power Capacity (MW)
|
30
|
Energy Capacity (MWh)
|
120
|
System Age (yr)
|
7.6
|
Battery Module
|
|
Integrator
|
AES Energy Storage
|
Application
|
|
Installation
|
Substation
|
Enclosure Type
|
Container
|
State During Incident
|
Undergoing maintenance
|
Source
|
San Diego Union Tribune
|
Additional Resources
|
Energy Storage News
|
|
One of 24 containers caught fire. Businesses adjacent to the substation or within approximately 0.25 mi were evacuated. A shelter-in-place order was issued for locations farther east. Classes were cancelled at some nearby schools. The fire started at noon on September 5, and was extinguished by 1 AM on September 6.[1][2]