Event Details | |
---|---|
Location: | Australia, Queensland, Bouldercombe |
Capacity (MW): | 50 |
Capacity (MWh): | 100 |
Battery Module: | Tesla |
Integrator: | Tesla |
Application: | |
Installation: | Substation |
Enclosure Type: | Integrated products |
Event Date: | 26 September 2023 |
System Age (yr): | 0.1 |
Extent of Damage: | Single container on fire, possible damage to surrounding containers |
State During Accident: | Operational |
Description: | |
Root Cause: | Integration, Construction, or Assembly |
Failed Element: | Balance of plant |
Source: | ABC News |
Additional Resources: | The Guardian Inside EVs |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.