Failure Event - China, Hunan - 7 Jan 2021
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | China, Hunan |
| Setting: | Recycling |
| Capacity (MWh): | |
| Capacity (MW): | |
| Battery Module: | |
| Operator / Integrator: | CATL, Brunp Recycling |
| Application: | |
| Installation: | |
| Enclosure Type: | |
| Event Date: | 7 January 2021 |
| System Age (yr): | |
| Extent of Damage: | explosion, 1 dead, 19 injured |
| State During Accident: | |
| Description: | |
| Source: | ESP |
| Additional Resources: | |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.