Failure Event - England, Essex, Tilbury - 19 Feb 2025

From EPRI Storage Wiki
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: England, Essex, Tilbury
Capacity (MW): 300
Capacity (MWh): 600
Battery Module:
Integrator:
Application: Frequency Regulation, Capacity Market, Balancing Mechanism, Wholesale Power Markets
Installation: Substation
Enclosure Type: Container
Event Date: 19 February 2025
System Age (yr): 0
Extent of Damage: A single container out of "multiple"
State During Accident: Construction
Description: A fire occurred in a single BESS container and was extinguished 1 day later. The Thurrock site was still under construction at the time. Firefighters relied on thermal imaging cameras and drones to monitor temperatures and manage the fire, and a water curtain was used to prevent propagation.
Root Cause:
Failed Element:
Source: Energy Storage News
Additional Resources: [https://www.essex-fire.gov.uk/incidents/firefighters-respond-battery-storage-site-fire-east-tilbury-2025-02-19-15-51 Essex County Fire and Rescue Service
Statera Energy]
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.