Failure Event - England, Essex, Tilbury - 19 Feb 2025
Jump to navigation
Jump to search
Overview
Event Details![]() | |
---|---|
Location: | England, Essex, Tilbury |
Capacity (MW): | 300 |
Capacity (MWh): | 600 |
Battery Module: | |
Integrator: | |
Application: | Frequency Regulation, Capacity Market, Balancing Mechanism, Wholesale Power Markets |
Installation: | Substation |
Enclosure Type: | Container |
Event Date: | 19 February 2025 |
System Age (yr): | 0 |
Extent of Damage: | A single container out of "multiple" |
State During Accident: | Construction |
Description: | A fire occurred in a single BESS container and was extinguished 1 day later. The Thurrock site was still under construction at the time. Firefighters relied on thermal imaging cameras and drones to monitor temperatures and manage the fire, and a water curtain was used to prevent propagation. |
Root Cause: | |
Failed Element: | |
Source: | Energy Storage News |
Additional Resources: | [https://www.essex-fire.gov.uk/incidents/firefighters-respond-battery-storage-site-fire-east-tilbury-2025-02-19-15-51 Essex County Fire and Rescue Service Statera Energy] |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.