Failure Event - England, Gloucestershire, Cirencester - 28 Mar 2025

From EPRI Storage Wiki
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: England, Gloucestershire, Cirencester
Capacity (MW): 10
Capacity (MWh): 51
Battery Module: Li ion
Integrator: Gridserve
Application: Solar shifting
Installation: Solar + storage
Enclosure Type: Container
Event Date: 28 March 2025
System Age (yr): 2.5
Extent of Damage: Two containers were affected.
State During Accident:
Description: A fire occurred in two BESS containers at Cirencester Hybrid Solar Farm. The solar + storage facility is DC coupled, with 23 MW solar and 10 MW of BESS. Two containers were affected by the fire, and propagation to a third container was prevented. The event lasted 7 hours.
Root Cause:
Failed Element:
Source: Warrington Guardian
Additional Resources: Energy Global
GRIDSERVE
Solar Power Portal
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.