Failure Event - Germany, Neuhardenberg - 18 Jul 2021
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | Germany, Neuhardenberg |
| Capacity (MW): | 5 |
| Capacity (MWh): | 5 |
| Battery Module: | [LFP] |
| Integrator: | |
| Application: | Solar Integration and Frequency Regulation |
| Installation: | Indoor/Hangar |
| Enclosure Type: | Container |
| Event Date: | 18 July 2021 |
| System Age (yr): | 5 |
| Extent of Damage: | |
| State During Accident: | |
| Description: | A BESS caught fire at a solar + storage facility. Images show the BESS being indoors. |
| Root Cause: | |
| Failed Element: | |
| Source: | RBB 24 (Translated) |
| Additional Resources: | RBB 24 (Original source, German) |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.