Failure Event - Netherlands, Amsterdam - 25 Jul 2022
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | Netherlands, Amsterdam |
| Setting: | Maritime |
| Capacity (MWh): | 0.7 |
| Capacity (MW): | |
| Battery Module: | Green Orca 1050 |
| Operator / Integrator: | EST-Floattech |
| Application: | Ship Hybrid Drive |
| Installation: | Shipboard |
| Enclosure Type: | |
| Event Date: | 25 July 2022 |
| System Age (yr): | 1 |
| Extent of Damage: | |
| State During Accident: | In transit / operation |
| Description: | Battery fire on Diesel-Electric hybrid river boat |
| Source: | The Maritime Executive |
| Additional Resources: | |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.