Failure Event - Netherlands, Amsterdam - 25 Jul 2022
Jump to navigation
Jump to search
Overview
Event Details | |
---|---|
Location: | Netherlands, Amsterdam |
Setting: | Maritime |
Capacity (MWh): | 0.7 |
Capacity (MW): | |
Battery Module: | Green Orca 1050 |
Operator / Integrator: | EST-Floattech |
Application: | Ship Hybrid Drive |
Installation: | Shipboard |
Enclosure Type: | |
Event Date: | 25 July 2022 |
System Age (yr): | 1 |
Extent of Damage: | |
State During Accident: | In transit / operation |
Description: | Battery fire on Diesel-Electric hybrid river boat |
Source: | The Maritime Executive |
Additional Resources: |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.