Failure Event - South Korea, Hadong - 21 Oct 2019
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | South Korea, Hadong |
| Capacity (MW): | |
| Capacity (MWh): | 1.3 |
| Battery Module: | |
| Integrator: | |
| Application: | Solar Integration |
| Installation: | Mountains |
| Enclosure Type: | Prefab |
| Event Date: | 21 October 2019 |
| System Age (yr): | 1.2 |
| Extent of Damage: | Fire |
| State During Accident: | Charged, inactive |
| Description: | A sudden deterioration in insulation
performance first occurred on BSC#1, followed by a gradual deterioration on the other side (BSC#2), resulting in a fire . |
| Root Cause: | Integration, Construction, or Assembly |
| Failed Element: | Balance of Plant |
| Source: | Social construction of fire accidents in battery energy storage systems in Korea |
| Additional Resources: | |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.