Failure Event - South Korea, Sejong - 28 Jul 2018
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | South Korea, Sejong |
| Capacity (MW): | |
| Capacity (MWh): | 18 |
| Battery Module: | Samsung SDI |
| Integrator: | |
| Application: | Demand Charge Mgmt |
| Installation: | Factory |
| Enclosure Type: | Prefab |
| Event Date: | 28 July 2018 |
| System Age (yr): | 0 |
| Extent of Damage: | |
| State During Accident: | Installation |
| Description: | Occurred in the process of supplying electricity for the commissioning of ESS, presumption of operator negligence, |
| Root Cause: | |
| Failed Element: | |
| Source: | Joongdo Ilbo |
| Additional Resources: | Original Source (Korean) |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.