Failure Event - South Korea, South Gyeongsang, Geochang - 22 Nov 2018
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | South Korea, South Gyeongsang, Geochang |
| Capacity (MW): | |
| Capacity (MWh): | 1.3 |
| Battery Module: | LG Chem |
| Integrator: | |
| Application: | Solar Integration |
| Installation: | Mountains |
| Enclosure Type: | Prefab |
| Event Date: | 22 November 2018 |
| System Age (yr): | 0.6 |
| Extent of Damage: | |
| State During Accident: | Charged, inactive |
| Description: | The fire burned 17㎡ (1,331 kW) of the first floor of the solar power generation facility, including the electricity storage facility, ESS room, and prefabricated sandwich panel structure. Property damage was estimated at 400 million won by the fire department, and the fire was extinguished in about 1 hour and 30 minutes. |
| Root Cause: | |
| Failed Element: | |
| Source: | Gyeongnam Newspaper |
| Additional Resources: | Original Source (Korean) |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.