Failure Event - South Korea, Ulsan - 21 Jan 2019
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | South Korea, Ulsan |
| Capacity (MW): | |
| Capacity (MWh): | 46.8 |
| Battery Module: | |
| Integrator: | |
| Application: | Demand Charge Mgmt |
| Installation: | Factory |
| Enclosure Type: | Concrete |
| Event Date: | 21 January 2019 |
| System Age (yr): | 0.6 |
| Extent of Damage: | |
| State During Accident: | Charged, inactive |
| Description: | |
| Root Cause: | |
| Failed Element: | |
| Source: | MOTIE Investigation, June 2019 |
| Additional Resources: | |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.