Failure Event - US, CA, Kearny Mesa - 29 Apr 2024
Jump to navigation
Jump to search
Overview
Event Details![]() | |
---|---|
Location: | US, CA, Kearny Mesa |
Capacity (MW): | 20 |
Capacity (MWh): | 80 |
Battery Module: | LFP |
Integrator: | Fluence |
Application: | |
Installation: | Substation |
Enclosure Type: | Integrated products |
Event Date: | 29 April 2024 |
System Age (yr): | 2.1 |
Extent of Damage: | |
State During Accident: | |
Description: | A safety incident occurred at the Kearny South Energy Storage Facility. The 20 MW / 80 MWh Kearny system consists of the Kearny North Energy Storage Facility and Kearny South Energy Storage Facility, both located at the same substation. |
Root Cause: | |
Failed Element: | |
Source: | CPUC Draft Resolution ESRB-13 |
Additional Resources: | Energy Storage News SDGE Today |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.