Failure Event - US, CA, Moss Landing - 20 Sep 2022
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | US, CA, Moss Landing |
| Capacity (MW): | 182.5 |
| Capacity (MWh): | 730 |
| Battery Module: | Tesla |
| Integrator: | Tesla |
| Application: | Energy Shifting, Ancillary Services |
| Installation: | Substation |
| Enclosure Type: | Container |
| Event Date: | 20 September 2022 |
| System Age (yr): | 0.5 |
| Extent of Damage: | |
| State During Accident: | Operational |
| Description: | Fire in one Megapack unit at PG&E Elkhorn battery facility |
| Root Cause: | Integration, Construction, or Assembly
Design |
| Failed Element: | Balance of plant
Controls |
| Source: | KSBW News |
| Additional Resources: | InsideEVs Teslarati PG&E |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.