Failure Event - US, CA, Otay Mesa - 15 May 2024

From EPRI Storage Wiki
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Otay Mesa
Capacity (MW): 250
Capacity (MWh): 250
Battery Module: LG Chem
Integrator: LS Power, NEC Energy Solutions
Application: Energy shifting
Installation:
Enclosure Type:
Event Date: 15 May 2024
System Age (yr): 3.7
Extent of Damage: Fire occurred in building #3 out of 5 buildings.
State During Accident:
Description:
Root Cause:
Failed Element:
Source: The San Diego Union-Tribune
Additional Resources: Greentech Media
The San Diego Tribune: Reignition
The San Diego Tribune: Incident Summary
Voice of San Diego
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.