Failure Event - US, CA, Parkfield - 30 Aug 2025
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | US, CA, Parkfield |
| Capacity (MW): | 60 |
| Capacity (MWh): | 240 |
| Battery Module: | NMC |
| Integrator: | Tesla |
| Application: | Solar integration |
| Installation: | Solar + storage |
| Enclosure Type: | Container |
| Event Date: | 30 August 2025 |
| System Age (yr): | 4 |
| Extent of Damage: | 4 out of 84 Megapacks damaged |
| State During Accident: | |
| Description: | A fire occurred at the California Flats Energy Storage Project, which is co-located with a 208 MW solar plant. The fire damaged 4 out of 84 Megapacks. 5 residences within a 2-mile radius were evacuated. The fire was allowed to burn out under controlled conditions. |
| Root Cause: | |
| Failed Element: | |
| Source: | Monterey County Sheriff's Office |
| Additional Resources: | Energy Storage News Arevon Energy |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.