Failure Event - US, NV, Boulder City - 23 Sep 2025

From EPRI Storage Wiki
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: US, NV, Boulder City
Capacity (MW): 90
Capacity (MWh): 360
Battery Module: Li ion
Integrator: Tesla
Application: Solar shifting
Installation: Solar + storage
Enclosure Type: Container
Event Date: 23 September 2025
System Age (yr): 3.8
Extent of Damage: 2 out of 114 Megapacks burned.
State During Accident:
Description: A fire occurred in a Megapack at a BESS facility co-located with a 194 MW solar plant. The fire propagated to one other Megapack. The two Megapacks burned over the course of 6 hours, after which the fire department turned over the site to the site owner to monitor the ongoing smoldering.
Root Cause:
Failed Element:
Source: KTNV
Additional Resources: CleanTechnica
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.