Failure Event - US, NY, Chaumont - 27 Jul 2023
Jump to navigation
Jump to search
Overview
Event Details | |
---|---|
Location: | US, NY, Chaumont |
Capacity (MW): | 5 |
Capacity (MWh): | 15 |
Battery Module: | General Electric |
Integrator: | Convergent Energy and Power |
Application: | Solar Integration |
Installation: | Rural |
Enclosure Type: | Container |
Event Date: | 27 July 2023 |
System Age (yr): | 0.4 |
Extent of Damage: | |
State During Accident: | Operational |
Description: | Fire was reported in an outdoor storage facility co-located with solar PV. A shelter-in-place order was issued for the surrounding community within 1 mile of the facility. |
Root Cause: | Design |
Failed Element: | Controls |
Source: | 7 News WWNYTV |
Additional Resources: | Convergent NYSERDA Spectrum Local News 7 News WWNYTV |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.